Daily archives: 12th April 2016


The project involved the merger of a number of local surgeries into one purpose built facility to serve the wider community. The building consisted of a number of two and three storey blocks connected with two storey atrium, waiting area and canopy. The structure typically consisted of steel moment frames […]

Chipping Norton Health Centre


These two number light industrial buildings provide 3250m2 and 4100m2 of floor area for distribution and warehouse use. The buildings are piled and suspended due to the poor underlying geology. The projects included a number of dock levellers and large expanses of concrete yard slabs. This practice was responsible for […]

UNIT 8 & HERMES, AVONMOUTH