Monthly archives: May 2021


LONGBRIDGE BIRMINGHAM This development provided circa 2000m2 of office space. There were challenging building geometry, aesthetics and ground conditions to overcome during this project. The finished building is a high-spec contemporary open plan office space with a BREEAM rating of Very Good. Client: St Modwen Developments LtdContractor: Barnwood Construction LtdArchitect: […]

3 DEVON WAY


WANTAGE This new build primary school consists of a two storey steel frame building with composite floor construction and Metsec SFS infill panels. The facilities include Sports England standard sports pitch and Multi-Use-Games Area. Client: Oxfordshire County CouncilContractor: Barnwood Construction LtdArchitect: Roberts Limbrick

KINGSGROVE SCHOOL




CARTERTON, OXFORDSHIRE This modern office development achieved a Breeam Very Good rating. It consists of a 3 storey building providing circa 2000m2 of office space with a 2 storey car park accommodating 250 parking spaces. There were challenging space and drainage constraints to this tight site. Client: Air TankerContractor: Barnwood […]

AIR TANKER


QUEDGELEY, GLOUCESTER This project consists of 6 number light industrial buildings of varying sizes. The ground contours required an extension cut and fill exercise adopting cement stabilisation process across the site. The foundations for these units were mass concrete strips and pads with ground bearing concrete floor slab. Below ground […]

GATEWAY 12


CIRENCESTER Provision of a Wickes store and further trade units for other companies within the Travis Perkins group where provided. Challenging ground conditions on this brown field site existed with a former infilled railway cutting, contaminated ground and 2m of fill present. A mixture of piled foundations and vibro-compaction ground […]

WICKES